Transforming a bank into a new busy store.
The Holt store was a major refurbishment transforming a former bank, which had been lying dormant, into a modern White Stuff store.
The project involved structural works to adapt or remove parts of the original bank, including the old vault doors and gate. Part of the ventilation and electrical works involved diamond core drilling in the original vault and the floor levels all required alteration. We also installed disability access at the rear of the property and made repairs to the window exteriors and features.
Throughout the store we lined the walls, installed new ceilings, flooring, and decorated to the specification of the new store concept.
Timescale: 6 weeks