Revitalising a tired space to meet today’s student needs.
This tired on campus nightclub was revamped and relaunched as a multi-use space which can now accommodate functions, and wellbeing classes such as yoga, in addition to its original usage.
The bar underwent a totally refurbishment; new ceilings, heating system, toilet facilities, removal of existing dancefloor, and decoration.
A mix of new flooring was installed throughout, including a stripped and repolished dance floor. The bar was altered to include a curved bar shutter to allow for the space to be used for non-licensed events, a new back bar installed and existing bar refaced. A bespoke corrugated door was also commissioned and installed.
Timescale: 10 weeks
Value: £360k